Project 64 – Labour Camp in DIP
Project: G+4 Labour camp Plot No 599-2157. Built Up Area: 73,207.04 sqf Location: DIP Consultant: M/s .Spacetech Engineering Consultancy Status: Ongoing
Project: G+4 Labour camp Plot No 599-2157. Built Up Area: 73,207.04 sqf Location: DIP Consultant: M/s .Spacetech Engineering Consultancy Status: Ongoing
Project: Labour Camp Plot No. 598 310 Built Up Area: 71,001.55 sqft Location: Dubai Investments Park Consultant: M/s Align Engineering Consultants Status: Completed
Project: G+4 Labour Accommodation Building Plot No. 597 868 Built Up Area: 110,189 sqft Location: Dubai Investments Park Consultant: Align Engineering Consultants Status: Completed
Project: G+4 Labour Camp Plot No. 597 971 Built Up Area: 73,016.90 sqft Location: Dubai Investment Park Status: Completed